HUMAN ERROR: The Biggest Challenge to Data Center Availability and how we can mitigate it – Part 2

it_engineer_with_server

The previous article on this topic can be found via this link.

The layered approach to upkeep data center infrastructure availability should not look like the Swiss cheese, i.e. the hazard or trigger should be eventually stopped and preferably as early as possible.

swiss-cheese

The layers should include the following:

  • Design (in accordance with design intent of owner) with either concurrent maintainability objective or fault tolerance
  • Implementation (in accordance with design brief) and fully tested via comprehensive testing and commissioning phase before handover with fully documented SOPs/MOPs/EOPs
  • Maintenance and Operations Management, work by equipment service providers or any work on site through Method of Statement and Risk Assessment matrix by suitably qualified person/persons
  • Incident and Problem management process, escalation management and mitigation process

and so forth

Possible problems arising from inadequacy in each of the layer can result in:

  • Inherent Design / Setting flaw
    • Outdated / swiss cheese situation
    • Requires analysis and manual intervention
    • Error Producing Conditions (EPC)
  • Weakness in manual processes
    • Inadequate automation
    • Inadequate training / familiarity
    • Inadequate operations procedures
  • Insufficient Information / knowledge
    • Capacity limit reached earlier than design intent
    • Inadequate training / knowledge
    • Inadequate documentations
  • Insufficient Risk Assessment
    • MOS / RA, risk matrix
    • Vendor experience

 

Learn from other industry

Our data center industry is a relatively young industry and there are other industries with mission critical infrastructure that have undergone extensive research and iterative enhancements which we can learn from and adopt.

  • Airline’s Crew Resource Management
    • Checklist and double checking by pilot and co-pilot on the airplane air-worthiness
    • Communications within the cockpit and the cabin staff with the cockpit to ensure timely and prioritized response
  • US Nuclear Regulatory Commission
    • Standardized Plant Analysis Risk – Human Reliability Analysis (SPAR-H) method to take account of the potential for human error
  • OECD’s Nuclear Energy Agency
    • Ways to avoid human error, e.g.,
      • Systems should also be designed to limit the need for human intervention
      • distinctive and consistent labelling of equipment, control panels & documents;
      • displaying information concerning the state of the plant so that the operator don’t need to guess and make a faulty diagnosis; and
      • designing systems to give unambiguous responses to operator actions so incorrect actions can be easily identified.
      • operators to be better trained for plant emergencies, use of simulators

 

 

Error Reduction Strategy and Error Predictor

In addition, error reducing strategies can be applied in all areas of data center maintenance and operations management to reduce the probability of occurrence of human error. Whether in design of the data center power and cooling infrastructure, or determining the risk of operations of particular maintenance operations (e.g. power switch-over exercise to perform UPS or back-up generator maintenance), all the strategy below should be applied.

Take for example the case of the AWS US-East-1 outage incident (http://mashable.com/2017/03/02/what-caused-amazon-aws-s3-outage/), the command set is powerful and a typo could bring down a lot of servers real quick. So AWS said in their post incident summary (https://aws.amazon.com/message/41926/) that they will limit the speed of the effect of the command and tool, i.e. put in safety check which is basically an application of the constraint strategy.

error-reduction-strategy

When service or repair task are assigned to operations staff, or by qualified technicians of equipment service provider, an evaluation of the existence of error precursors and eliminating these pre-cursors will reduce the likelihood of human error. For example, the combination of time pressure, inexperienced staff already at the end of the long work shift and ambiguous task objective are all contributor to a higher risk of the assigned task. Eliminate, reduce, and re-direct to an experienced staff at the start of the work shift with clear task objective will reduce the risk of the assigned task.

error-precursors.jpg

Risk Mitigation is a Continuous Process

A multi-prong multi-layer and attention to details approach are required to mitigate the risk of human error causing an outage in a data center facility.

Risk Mitigation Process Flow.jpg

 

Design and implementation of a data center to a set of clear and tested design intent (e.g. objective of data center being concurrently maintainable). Day-in and day-out the operations staff, vendors, client personnel interact with the system within the data center. So there need to be a well oil system in place, not only just documentations, that works 24×7 for as long as the data center is in existence.

An iterative risk mitigation system, relying upon consistent management support and attention, with knowledge learned from near misses and incidents are key attributes of an environment that is resilient in terms of the human aspect.

We Human can reduce Human Error, effort required

We should look at the data center organization especially the operations team, the resources and tools, the capability of the operations team, and so forth. A culture of no blame, and encouraging active participation by all staff to address potential weakness or error precursors, addressing near-miss which is a sign of error inducing conditions, are important to mitigate effects of human errors. We should get away from pointing fingers and to learn from past problems, like what AWS did with their incidents. And our data center industry can do more to share and learn from one another, to prevent future occurrence of issues that were faced and dealt with elsewhere.

This built-up knowledge of good practices should be documented and disseminated, with management support. The weakest link is an inexperience staff hesitating or worse making a wrong decision, so training everyone on the operations team is critical to maintaining availability of data center.

A periodic (for example annual basis) no-nonsense third party data center operations and management review coupled with improvement plans to strengthen those weakest links will boost insight and assurance to data center C-level executives, data center operations managers, and clients. Most operations manager will be too busy to review their own data center operations, coupled with the difficult position of finding your own fault and limited experience if the staff have not worked in more than one or two data center sites, therefore a third party operations and management review is the next best thing to enhance resilience against human error provided it has the full co-operation from top to bottom of the data center staff.

Furthermore, if a data center service provider has grown beyond 2 to 3 data centers, it will be difficult to consistently manage the data center operations across them especially if they are managed independently. A third party review that is applied to all of them will help to reign in inconsistent operations processes, subject to having a central data center operations programme function within the data center service provide, of course.

Therefore, a data center facility is ultimately dependent on well trained and knowledgeable staff, whom are clear about their data center facility information or knows where to quickly find the documentation that contains the detail information, do the risk assessment work of evaluating equipment service vendor or upgrade works properly.

In summary,

  • It is worthwhile to commit resources to reduce errors
  • We can do improve our resiliency and thereby uptime through available methods and tools
  • There are proven methods and tools we can borrow from other mission critical environments
  • Third party data center operations and management review coupled with improvement plan should be considered for large data center operations especially those that have multiple sites

 

References:

  1. https://en.wikipedia.org/wiki/Human_error_assessment_and_reduction_technique
  2. http://news.delta.com/chief-operating-officer-gives-delta-operations-update
  3. https://journal.uptimeinstitute.com/examining-and-learning-from-complex-systems-failures/
  4. http://www.enterpriseinnovation.net/system/files/whitepapers/1_2016-cost-of-data-center-outages-final-2.pdf
  5. https://www.oecd-nea.org/brief/brief-02.html
  1. http://www2.lbl.gov/ehs/training/assets/docs/Error-Precursors.pdf
  2. https://www.linkedin.com/pulse/data-center-human-factor-james-soh-%E8%8B%8F%E6%97%AD%E6%B1%9F

 

  1. https://www.linkedin.com/pulse/human-errors-biggest-challenge-data-center-how-we-can-james-soh-%E8%8B%8F%E6%97%AD%E6%B1%9F
Advertisements
HUMAN ERROR: The Biggest Challenge to Data Center Availability and how we can mitigate it – Part 2

Human Error: The biggest challenge to data center availability and how we can mitigate – Part 1

it_engineer_with_server

The 2016 Ponemon Institute research report on Cost of downtime (reference 1) contains a chart showing the cause of data center downtime, and classify accidental human error to be 22%, and the top six contributors to downtime are UPS system failure (25%), cyber crime (22%), accidental human error (22%), water/heat/CRAC failure (11%), weather related (10%), and generator failure (6%). However, the accidental human error did not account for latent human error that could have contributed to those UPS/CRAC/Generator failure.

ponemon2016

Uptime Institute had cited 70% of data center outages can be attributed to human error.

The definition of human error is broader and can be generally classify into Active Error (where a deliberate action caused deviation from expected outcome), and Latent Error (where a non-deliberate action caused deviation from expected outcome). For example, when a design decision is made regarding the power protection circuit for a data center room, if it was not fully co-ordinated to isolate and protect power issue to cascade upstream to higher level circuit breakers.

There are many cases of major outages in the past few years that are attributed to human error. The 2016 Delta airline data center outage is reported to cost them USD 150 Millions. Part of the long delay (3 days) to resume service is that a significant part of their IT infrastructure is not connected to backup power source which begs the question why did it happen that way? Well, it should be due to latent error, where the IT equipment installation or the in-rack PDUs are not from two separate UPS or supported by in-rack ATS switch.

I was asked a question during my presentation on this subject matter whether higher tier level aka higher resiliency designed and implemented data center can minimize this issue of human error. My answer is you can design and implement to 2N power and cooling infrastructure, but when 1N is taken down for maintenance, any mistake or weakness (inexperience operations staff/vendor personnel, procedure gap that human nature overlooked and made wrong guess etc) can take down the IT load and has happened to many data centers (google search on human error and data center outage incidents).

swiss_cheese_model_of_accident_causation

There are multiple ways for the human error to manifest in a data center outage. They can be simple external trigger that goes through loopholes like the Swiss cheese above, or cascade (combination), or direct active human error.

For example on cascade, a case of lightning strike that caused momentary power dip (see reference) should not cause an outage in a data center; however if the selection of circuit protection device or the design did not cater for how the DRUPS would respond in such a situation, and the automated control was not configured to deal with it, then any amount of SOP/MOP/EOP or Method of Statement-Risk Assessment (MOS-RA) may not protect the facility against a particular external trigger. A case of a data center in Sydney whereby the circuit breakers were not designed and selected to cater to such a scenario caused the UPS to supply to the grid instead of to the load.

For direct human error, I have also known a case of UPS manufacturer trained and authorized service engineer causing an outage, where the engineer did not follow the documented service manual and caused the entire set of UPS to tripped, and because the circuit protection devices were not able to isolate the fault downstream, caused the upstream incoming breaker to trip. This is part of the reason why data center staff should accompany and question the service engineer at critical check-points during servicing of critical infrastructure.

Outage can be failure of the resilient design / implementation due to under-capacity. This can be traced to latent (no tracking of actual power capacity versus designed capacity) or active (no checking of UPS capacity before maintenance). For example, actual power usage of N+1 UPS has actually become N UPS, and when one of the UPS was down, the entire UPS set shutdown.

In the next post, measures to mitigate the risk of human error will be discussed.

References:

  1. http://www.enterpriseinnovation.net/system/files/whitepapers/1_2016-cost-of-data-center-outages-final-2.pdf
  2. https://aws.amazon.com/message/4372T8/
  3. http://news.delta.com/chief-operating-officer-gives-delta-operations-update